Hourly rates of incentive bonus and bonus factor of Workshops

Railway Board Letter No
2008/M[W]/814/38 dated 29.10.2009
Date
RBE No
194/2009
Circular Subject
Revision of hourly rates of incentive bonus and bonus factor of Workshops/PUs in respect of staff under CRJ pattern/GIS.

 

1.         The subject of revising hourly rates of bonus and bonus factor subsequent to implementation of Sixth CPC pay structure has been under consideration of Ministry of Railways for sometime.  The matter has been examined and it has been decided to revise hourly rates of incentive bonus and bonus factor provisionally as indicated below:

 

Designation

Pay Range

Hourly Rates [Rs.]

Bonus Factor under GIS at 100% [Rs.]

Jr. Engineer[s]/Sr. Technician

9300-34800/GP-4200

49.65

13440

Tech. Gr.I

5200-20200/GP-2800

43.30

11700

Tech.Gr.II

5200-20200/GP-2400

38.50

10400

Tech Gr.III

5200-20200/GP-1900

32.20

7930

Semi Skilled/ Unskilled

5200-20200/GP-1800

25.45

6760

Unskilled*

4440-7440/GP-1300

24.50

6630

            [* Till placed in PB-1]

 

2.         It has also been decided that SSE/SE[s] in PB-2  grade Pay Rs.4600 supervising the work of staff working  on the shop floor will get monthly payment of incentive bonus calculated at flat rate of 15% of their basic pay.

 

3.         Payment of incentive to Junior Engineers, essentially indirect workers and supervisors at the revised rates indicated above shall continue to be governed by the conditions laid down in Railway Board’s letter No. PC-IV/88/Incentive Bonus/1 dated 6.10.89.

 

4.         The rates for PCO allowance have already been advised vide Board’s letter No. E[P&A]I/2008/SP-I/WS-4 dated 06.2.09 and 23.04.09.

 

5.         Kindly note that bonus factor earlier calculated by multiplication of minimum of basic pay with 1.3 has been replaced with a revised total value [at 100%] as indicated above.  No multiplication with any factor is to be done with this value. 

 

6.         The revision of hourly rates of incentive bonus and bonus factor of workshops and PUs is linked with 5% improvement in productivity in the workshops/PUs.  Therefore, necessary adjustments in the total allowed time for each job in the workshops will have to be calculated accordingly in case of CRJ pattern incentive scheme in workshops/PUs.  Similarly, for workshops/PUs under GIS, the productivity is to be increased by 5% without additional payment.  The work of revision of allowed time in workshops/PUs should be taken in hand and should be completed by 30.11.09.

 

7.         It has been decided to effect 5% improvement in productivity on a prospective basis i.e. w.e.f. 1.12.09.

 

8.         The revised rates as indicated in the table will be effective from 1.6.09.

 

9.         Other guidelines not covered in this letter for payment of incentive to staff under CRJ/GIS pattern incentive schemes shall continue to be in force. 

 

            This issues with the concurrence of Finance Directorate of Ministry of Railways.